A CASE STUDY: HOW
5S IMPLEMENTATION IMPROVES PRODUCTIVITY OF HEAVY EQUIPMENT IN MINING INDUSTRY
Atma Yudha Prawira
Mercu Buana University, Indonesia
E-mail: atma.yudha.prawira@gmail.com
Yuwarni Rahayu
Mercu Buana University, Indonesia
E-mail: rahayuyuwarni@yahoo.co.id
Mohammad Hamsal
Bina Nusantara University, Indonesia
E-mail: sdm2000@mail.com
Humiras Hardi Purba
Mercu Buana University, Indonesia
E-mail: hardipurbaipb@gmail.com
Submission: 17/04/2018
Accept: 23/04/2018
ABSTRACT
This research aims to identify and present key
concepts of 5S perspective. These findings link 5S to productivity improvement,
which are aligned to an integrated maintenance system rather than maintenance
system before. Data were collected from one of mining company in Indonesia. The
data is concern in downtime unit, availability and productivity from one of
heavy equipment, which is huge dumb truck. Then applying 5S method to decrease
downtime unit, increase availability and at the end productivity of heavy
equipment is increasing. The result will be compared between before and after
5S implementation. These findings demonstrate the importance of both the
technical (visible) and philosophical (invisible) approaches required for each
of the 5S components and are discussed in a team rather than cultural
framework. The results indicate that 5S implementation may be a source of
competitive advantage which can increase heavy equipment performance. The
originality and value of the paper is come from the general understanding of the
application of 5S and its use as an improvement tool at the system or process
level. 5S within the context identified is the strategic platform for the
managerial decisions required for the development of an integrated maintenance
system.
Keywords: Mining Industry, 5S Application,
Productivity, Integrated Maintenance System
1. INTRODUCTION
Nowadays, in this dynamic and
technological world, the secret of surviving for any kind of organization is to
be competitive and pioneer in its products or services. Normally, this
improvement has been achieved through implementation of best practices, which
are chosen to meet a particular objective (SINGH et.al, 2014).
5S programs have been implanted in
organizations and the world as a way to improve production values while also
improving employee morale and safety. The 5S methodology may be applied to most
workplace scenarios in a short period of time due to its simple nature (PATEL;
THAKKAR, 2014).
Lean thinking represents a set of
principles and techniques for the identification and elimination of waste in
manufacturing and administrative processes. 5S is a technique originated from
Japan and it was first developed by Hiroyuki Hirano in 1980s. It includes five
Japanese words Seiri (Sort), Seiton (Set in order), Seiso (Shine), Seiketsu
(Standardize) and Shitsuke (Sustain). The 5S philosophy focuses on
simplification of the work environment, effective workplace organization, and
reduction of waste while improving safety and quality (KORKUT et.al, 2009).
The 5S concept comes from Japan. The
original purpose of the 5S is to make the workplace orderly to improve safety
and efficiency, reducing the product defects rate. It is expressed by five
Japanese words that express cleaning and order at the company and accepting this
as work discipline (PATRA et al., 2005; MORA, 2007).
According to Ravinder (2012) and
Khedkar et.al (2012). 5S allows the enhancement of efficiency and productivity.
The 5S technique is a structured program to systematically achieve total
organization cleanliness and standardization in the workplace. The benefit of
5S technique is improvement in productivity, quality, health and safety.
Sorooshian (2012) said Through 5S
methodology, the management can create an environment where quality work is
comfortable, clean and safe in the organization and it can ensure the
compliance to standards and will further foster continuous improvement.
In the beginning, 5S methodology was
used to develop an integrated management system which developed in the total
production maintenance (TPM) (BAMBER et al., 2000). It is aimed to have trouble
free machines and equipments without any breakdown and producing components to
the quality level giving total customer satisfaction.
Maintenance can be carried out as
Preventive Maintenance, Breakdown Maintenance, Corrective Maintenance and
Maintenance Prevention. Planned Maintenance is a proactive approach which uses
trained maintenance staff to help train the operators to better maintain their
equipment.
Objective of Planned Maintenance are
to achieve and sustain availability of machines, optimum maintenance cost,
improve reliability and maintainability of machines, zero equipment failure and
break down and ensure availability of spares all the time (SINGH et al., 2012).
On the other hand, in the West 5S
has a minimal use and is associated with an activity of maintenance (BECKER,
2001). At this time, the improvement requirement in different organizations may
be affected by different complexity of systems. Furthermore, it is really
important to know which method can help us begin the process of continuous
improvement in order to achieve increased productivity and safety of the
workplace through participation and knowledge of the involved staff.
It is why such university methodologies
are considered as essential tools for the development of future professionals,
especially engineers (SHEPPARD et al., 2008), and there is no doubt that one of
the best ways to assimilate a methodology is through routine use.
The 5S methodology is not seen in
the same way in all countries. For example, as you can see in Kobayashi et al.
(2008), Japan emphasizes 5S as a strategy for business excellence, requiring
participation both at work and in the home; in the other hand, 5S in the UK and
US is viewed as a system or tool for the workplace only.
In some countries, the
implementation of 5S methodology is a simple way to comply with the minimum
requirements for health and safety in the workplace. This relationship has led
to the possibility of extending the scope of the 5S through the incorporation
of a new S, ‘safety and health’ (ZELINSKI, 2005).
Jiménez et.al. (2015), The present
research project, developed in a university environment, responds to the
continuous improvement process implementation and the need to optimize
available resources used in different laboratories for trials and practice.
During the project deployment we
have released two initial obstacles which, in addition, have marked the
development of the project: (1) How should the improvement be approached,
controlling costs and trying to simplify the implementation process? (2) How
can the use of resources be increased during the laboratory practice
(productivity), with safety and the minimization of risk? For an improvement,
it was decided that the basis should be to organize, sort and maintain in
perfect condition all the involved resources. On the other hand, the
productivity increase in the resources used, and the improvement of the
workplace should come through the definition of a systematic management plan
that maintains and improves that process.
According Al-Aomar (2014), The 5S's lead to improved processes
in terms of many aspects including: (a) Transparent process flow. (b)
Clean workplace. (c) Reduced set-up times (d) Reduced cycle times. (e)
Increased floor space. (f) Lower safety incident/accident rate. (g) Less wasted
labour time. (h) Better equipment reliability.
This paper focus on the results of
the case studies carried out as part of a research project in developing and
evaluating the checklist audit for the 5S practice in mining industry. However,
the lack of knowledge about the real meaning of 5S is the exclusive challenge.
Many employees just know 5S only as a motto of the company but they don’t know
exactly the strong point its self. So, in this paper will explain 5S base on
study literature from many projects and papers around the world. And also, how
to implement on the work bench then get the output as productivity improvement.
For more specifics, in this project will focus on productivity improvement of
heavy equipment by implemented 5S in mining industry.
2. METHOD
Patel
and Thakkar (2014), A method commonly used by a manufacturing
company to achieve an effective, efficient, and organized work environment, so
as to boost productivity, reduce cost, and improve quality standards. 5S
include five Japanese word which are seiri, seiton, seiso, seiketsu, and
shutsuke.
5S programs have been implanted in
organizations and the world as a way to improve production values while also
improving employee morale and safety. The 5S methodology may be applied to most
workplace scenarios in a short period of time due to its simple nature. The
before and after picture are taken for implementation of 5S methodology in a
company.
2.1.
Seiri
(Sort)
Patel
and Thakkar (2014), Sorting items which are not necessary and segregating and
disposing of goods that are not needed at work systematically. Separation
process is helpful in determining the necessary materials at the present or the
future and should be stored in a designated storage area. Unnecessary items
will be disposed.
The
arrangement used for keeping each material in the company at correct place is
named as sort. The defective or rarely used material and equipment’s in the
company cause the demolishment of the workplace’s order and decrease in the
work efficiency. This leads to fewer hazards and less clutter to interfere with
productive work.
Figure 1: 5S Methodology
Sorting
necessary and unnecessary materials is called “sort”. The arrangement used for
keeping each material in the company at correct place is named as Sort (Mora,
2007). The defective or rarely used material and equipment in the company cause
the demolishment of the workplace’s order and decrease in the work efficiency (SARICOBAN,
2006).
Therefore,
the necessary and unnecessary materials available in the workplace should be
sorted and classified. In order to improve the availability of the working
machine and hardware; some workstations such as the machines, tools, hand
machines, materials to be used etc. should be kept available in an order and at
places where can be easily accessed (CELEBI, 1997; KOCAALAN, 1999).
For
this reason, when this first basic principle is well applied, the problems and
complaints through the work flow will decrease and the communication between
the personnel will be simplified. In addition to this, since serious savings
will be obtained in the size of the required working environment, important
drops will be observed in the operation cost (SARICOBAN, 2006).
2.2.
Seiton
(Set in Order)
According
to this purpose, a localization order is designed for easily accessing to the
necessary materials at required times and the materials are put their own
places again after utilization (PATRA et al., 2005). As a result of the
arrangement performed at the work stations (machines, tools, hand tools,
materials to be used, etc.), these should be kept at a place where can be
accessed easily due to the case of requirement (KOCALAN, 1999).
The
place where the operation is actually realized, material transition paths and
the storage method are the points that should be considered in this step. Some
points that can be controlled during regulation can be summarized as following
(CELEBI, 1997): (i) Stock areas should be used at top level. Solutions such as
a shelf order in proportion to the height of the classified material and
drawers instead of big sized cupboards and boxes can gain efficiency in terms
of stocking. (ii) In cases where “First in first out” principle is used, it
should be avoided that stocking is deep. (iii) The stock areas, shelf and
drawers as well as materials should be labelled. (iv) In case if the dimension
and kind of the product change, then special vehicles may be used in machine
adjustments.
Especially
important is visualization of the workplace in order to focuses on the need for
the workplace. Tools, equipment, and materials must be systematically arranged
for the easiest and the most efficient access. The main objectives of Seiton
are forming a regular workplace, avoiding time loss while searching the
material and mistake proofing work (PATEL; THAKKAR, 2014).
2.3.
Seiso
(Shine/Sweep)
In
order to realize effective tasks, it is essential to create a clean and regular
working and living environment (PATRA et al., 2005). This is because dust, dirt
and wastes are the source of untidiness, indiscipline, inefficiency, faulty
production and work accidents (ANON, 2007).
We
can handle cleaning practices as a two-stepped approach; “general cleaning of
workplace and availability of dirtiness sources” and “machine, hardware, tool
cleanliness” referred as detailed cleaning (CELEBI, 1997).
In
case of detailed cleaning, some advantages can be obtained. These can be
summarized as following (KARABULUT, 1999): (i) Dirt and dust causes bad
operation, corrosion and early demolishment of machine and its components.
Therefore, dirt and dust sources are removed. (ii) As a result of making the
workplace more proper to the working conditions, the morale of the personnel
improves. (iii) The abnormal cases such as lubricant leakage, wastes, etc. are
recognized immediately. (iv) As a result of psychological impact, the reactions
and performances of the personnel get better. (v) Through providing a safer
working environment, the danger contained works decrease. In order to realize
shining through an effective system, the names of the personnel who are
responsible from the cleaning of each zone, each department and each point of
the factory should be clearly determined and written at the proper places.
The
shining time should be very short in order to obtain effective utilization. The
best times for cleaning are the beginning of shift, end of shift or after meal.
All personnel should be well trained about cleaning and participate in
cleaning.
Point
outs the need and necessity of clean and neat work place. Cleaning should
become a daily activity. The dust, dirt and wastes are the source of
untidiness, indiscipline, inefficiency, faulty production and work accidents.
There for Work place should be cleaned at regular intervals. Every tool and
equipment should be restored at their own places after their use (PATEL;
THAKKAR, 2014).
2.4.
Seiketsu
(Standardize)
Following
the application of first 3S principles, the necessary systems are formed in
order to maintain the continuance of these good practices at the workplace. In
order to do this, these activities should be written according to the
procedures and the memorization of these procedures by the personnel as well as
the functionality of the rules should be obtained.
Providing
the visual control that will enable the revealing of the problems that may
negatively affect the conducted cleaning and the order is very important here.
The methods which can be recognized by anyone at the workplace, not only by the
relevant person, should be developed. It will be appropriate to write down
performance monitoring labels, control lists, tables and some procedure for
visual understanding on TPM board that will be formed in order to control the activities.
Following
the visual control, the following activities are realized in standardize (CELEBI,
1997; KOCAALAN, 1999): (i) Allocation of workplace in terms of area or machine
based regions. (ii) Determination of representatives for each region. (iii)
Identification of points required to be controlled in each region (formation of
cleaning-order lists). (iv) Removal of negativities recognized as a result of
controls. For full application and development of the standards, the
participation of all personnel is required.
Therefore,
standardization means to make correct attitude and behaviours as daily habits
and assure their full application in order to get over the handicaps in the
first three basic principles.
Establishing
the standard rules to maintain the perfect hygiene and safe environment at the
workplace. The goal of this step is keeping, standardize, and preventing from
this present order and regularity. The necessary systems are formed in order to
maintain the continuance of these good practices at the workplace. Standards
should be very communicative, clear and easy to understand. Regarding this
during preparation and improving, it should be involved all participants of the
process on the given workplace, it means direct workers (PATEL; THAKKAR, 2014).
2.5.
Shitsuke
(Sustain/Self-discipline)
The
last step of 5S program covers the improvement of the methods directed to the
adaptation of 5S as habit by all personnel. The task here is undertaken by the
leader directors. The directors should explain the importance of 5S to the
personnel through various trainings and the knowledge of the personnel about 5S
should be kept. Updated through the 5S boards to be formed at the workplace.
Through
various campaigns with easy participation, the dissemination of 5S should be
targeted (CELEBI, 1997). The objectives of these studies can be summarized as
following (KARABULUT, 1999): (i) Formation of a disciplined company. (ii)
Removing small faults through the aid of cleaning. (iii) Providing the
execution of visual control. (iv) Granting the responsibility of the machine to
the worker. (v) Providing the performance of protective activities. (vi) And
granting the responsibility of the workplace to the personnel.
Always
Practice (Shitsuke): Train employees disciplined for practicing 5S system
continuously so that the habits and culture within the organization. This is by
far the most difficult S to implement and achieve. People tend to resist change
and even the most well-structured 5S plan will fail if not constantly
reinforced. It creates an educating, co-operating, discipline system and
inspection for protecting the best present situation (PATEL; THAKKAR, 2014).
3. 5S APPLICATION
According
to last research by Al-Aomar (2014) about applying 5S Lean. It is often simple
to talk about how lean approaches work and about 5S in particular. However, the
implementation of lean tools on the floor is totally different. This is because
5S is not just a methodology; it is a culture change that involves all parties
to drive the organization towards effectiveness and continuous improvement.
Thus, we had to first make it clear to all project parties why we are adopting
the 5S lean technology.
The
diagnostic study conducted at the Prefab plant revealed the following issues
that collectively call for 5S application in the plant to identify process and
improve layout and flow: (a) Space is crowded with parts and tools. (b)
Unneeded items are stacked between workers. (c) Excess inventory on the floor.
(d) Excess items and machines make it difficult to improve process flow. (e)
Equipment is dirty and a collection point for miscellaneous materials. (f)
Needed equipment such as tools are difficult to find.
Based
on the diagnostic study, the 5S lean technique is adopted for process identification
and workflow improvement at the Prefab factory for the following reasons: (a)
5S facilitates process definition by cleaning, sorting, and setting in order.
(b) 5S provides the infrastructure necessary for plantwide improvement. (c) 5S
is essential for streamlined process flow and layout redesign. (d) 5S is
essential for worker motivation and increased loyalty. (e) 5S is the key for
clean production environment. (f) 5S is essential to deploy safety measures and
reducing accidents. (g) 5S is key to waste reduction: Minimizing waste and
reusing waste materials, minimizing effort and time wasted in searching,
removing excess material and inventory (AL-AOMAR, 2014).
It
is also worth mentioning that 5S is not a list of action items that has to be
reviewed at some interval of time. Instead, it has to be practiced consistently
in all times. Thus, a practical step-by-step approach should be followed to
make 5S attain a successful implementation. The followed project steps are
summarized in the following: (a) Process structure and identification (layout
and flow). (b) Awareness and training on 5S approach. (c) Overall plant inside
and outside clean-up. (d) Applying 5S to 10 plant departments. (e) Utilizing
checklists for 5S implementation and auditing. (f) Waste reduction (less waste
and reused materials). (g) Space utilization (clearing main aisle, providing
space for reused items, clearing plant floor, providing space for material
handling). (h) Cleaner and safer work environment. (i) Setting a basis for labour
incentives. (j) Achieving a better labour morale (AL-AOMAR, 2014).
In
this project, plant department is responsible for heavy equipment maintenance.
As shown in figure 2, there are 4 areas separated based on its function such
as; workshop area, washing area, welding area and workshop. Everyday, mechanic
walk from workshop to warehouse and welding area to take spare part and get the
welder then ask him to come to workshop for welding activity.
At
that time, there is no clear boundary lines in workshop area. It is also hard
to move materials from one area to another. Only one crane is used to lift
heavy materials and parts then move them from one area to another. Workstations
are dirty and flooded with excess inventory and rusty tools. The improved layout
shows cleared main aisle, no flow obstacles, marked in/out areas, and more
space for reusing items and material handling. These plant areas are organized
and the main plant aisle is cleared and marked.
Figure 2: Layout Plant Area Before
5S Implementation
First,
identifying the problem on maintenance flow and process. After that, find
alternative solution to fix them by using 5S method in order to improve the
productivity of the heavy equipment. Then 5S is implemented at the 4 areas in
plant department.
An
action plan is set and followed as a practical guide for translating 5S method
and principles into specific actions that mechanics can easily understand and
sustain. This implementation is huge challenge as a project team. The team has
to work with general labour and mechanics on a cultural change.
They
have to believe in the actions taken in 5S application in order to make
tangible and sustainable changes on the floor then improve the productivity. To
this end, the team focused the 5S implementation effort on one plant area to
create labour awareness in the 5S method and to provide tangible evidence that
can convince labour to cooperate with the changes and believe more in the 5S
value and benefits.
The
team started with sorting, ordering, and cleaning the workstation. Many
obstacles come from cultural change, have enough time to receive the change.
Great commitment has to invest on mechanics body and believe them. This is one
from many ways to be greater day by day.
We
started to explain to mechanics that this work is simply to clean and organize
their workplace, it doesn’t mean to add their job, and the cleanest and tidiest
workstation will be rewarded and good for their carrier step. As a result,
mechanics start to help in 5S implementation at the workshop area first.
Mechanics that work on repair and maintenance area is trained on what exactly
need to be done to keep the area clean and organized. The 5S procedure form,
motivation words and PIC picture posted at the work area.
Figure
3 shows the layout of plant area after 5S implementation, it is results of 5S
application to the plant area. It is more efficient with less movement and
speed up the maintenance downtime and the actual status of the workstation that
the 5S application has resulted in a clean and organized work area. Aisle
passes through the area is cleared to allow for easy access of material
handling.
Few
days later, everybody at the plant noticed that the workstation area has become
cleaner, tidier and more organized. The morale and the productivity of the area
workers have also improved. It was the right time to explain and approach to
all to keep 5S application at plant areas. In 5S application to workshop, it
was important to develop a 5S checklist based on the 5S practical guidance
discussed before.
The
check list helps identifying opportunities and techniques for 5S successful and
comprehensive application. The project deliverables to plant and a detailed
layout is summarized in a 5S table as summarized forms to develop each area.
Results collectively revealed a better process flow and a cleaner work
environment. Specific actions on the floor were taken to save space, create and
label storage areas, mark aisles and increase safety.
A
new layout is developed, the plant significantly looked greater. We make an
integrated workshop which completed with washing and welding area. Hand tool is
being collected then make into one mechanic one toolbox. To guarantee for
condition of hand tool, mechanic have to responsible for it and make any report
to their team leader if there is broken or missing tools.
Then
reduce significant unnecessary movement, and make a new Kanban to keep with
minimum-maximum number of spare part that should be control by team leader. The
Kanban is really useful, especially to reduce the daily walking to workshop and
waiting for the spare part. We make good planning for service unit then prepare
all the material regarding the service level. So, mechanics do the service
better and faster.
As
the result the break down time for unit that caused by service and maintenance
can be minimized. At the end, the unit availability is increased and create
high productivity for unit.
Figure 3: Layout Plant Area After
5S Implementation
4. 5S BENEFITS AND KAIZEN
“Kaizen”
literally means “change for the betterment”. Kaizen involves small improvements
and is carried out on a continual basis and involving people of all level in
the organization. The principle behind Kaizen is that "a very large number
of small improvements are more effective in an organizational environment than
a few improvements of large value”.
This
pillar is aimed at reducing losses in the workplace that affect our
efficiencies. By using a detailed and thorough procedure we eliminate losses in
a systematic method using various Kaizen tools. Objective of Kaizen is achieved
and sustain zero loses with respect to minor stops, measurement and
adjustments, defects and unavoidable downtime (SINGH et al., 2012).
The
most frequently occurring concepts were: cleaning (seiso and seiketsu),
improvement (kaizen) and arrangement (seiri and seiton); all three concepts
were strongly linked to each other. These concepts were followed by place,
management and activity, place and activity were closely linked and management existed
in its own right. The fifth S shitsuke was emphasised as training, which was
linked to the concepts of method and workplace (GAPP et.al, 2008).
In
this project, we can calculate the benefit after 5S implementation which
effects the heavy equipment productivity. Availability is well established
in the literature of stochastic modelling and optimal maintenance. Barlow and Proschan (1975)
define availability of a repairable system as "the probability that the
system is operating at a specified time".
Blanchard
(1998) gives a qualitative definition of availability as "a measure of the
degree of a system which is in the operable and committable state at the start
of mission when the mission is called for at an unknown random point in time”.
Productivity describes
various measures of the efficiency of production.
A productivity measure is expressed as the ratio of output to inputs used in a
production process, i.e. output per unit of input. Productivity is a crucial
factor in production performance of firms and nations.
Increasing
national productivity can raise living standards because more income
improves people's ability to purchase goods and services, enjoy leisure,
improve housing and education and contribute to social and environmental
programs. Productivity growth also helps businesses to be more profitable.
There are many different definitions of productivity and the choice among them
depends on the purpose of the productivity measurement and/or data availability
(GOLLOP, 1979).
The
study identified a major emphasis for Japanese 5S organisations, that being “to
create a better workplace.” An implication in this finding is that the
implementation and management of 5S in the Japanese organisations studied.
Availability measures are classified by either the time interval of interest or
the mechanisms for the system downtime.
After that, we can calculate the availability with formula below:
After
that we can calculate the productivity based on availability data with formula
below:
If
the time interval of interest is the primary concern, we consider
instantaneous, limiting, average, and limiting average availability. From all
formula above, by reducing breakdown time. On way to reduce breakdown time is
reducing service and maintenance time. By making better workstation by using 5S
method to reduce breakdown time of heavy equipment.
After
implementation, mechanic can speed up repair and maintenance time with better
result and then impact high availability. With high number of availability, it
will also increase the productivity. Table 1 and 2, describing comparation from
5S implementation related to availability improvement.
Table
1: Maintenance Activity Lead Time Before and After 5S Implementation
Before |
After |
|||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
Table
2: Availability and Productivity of Heavy Equipment Before and After 5S
Implementation
Before |
After |
|
|
Figure
4: Heavy Equipment Performance May and June 2016
5. CONCLUSION
Due to implementation of 5S, there
was improvement in space utilization, reduce unnecessary movement, creating integrated maintenance
system, reduce time to find the tools and material, increase safety of the
employees, decrease scope of error, increase productivity, and improved
inventory system, also increasing of machines’ efficiency, maintain the
cleanness of tools and material, maintain the workstation cleanness, easy to
check, quick informing about damages (potential sources of damages) and improve
working environment.
The result of implementation of 5S
is 400m square space saving in the plant department, much movement of men,
material is reduced. Awareness of the 5S concept indirectly improved the morale
of employees with better working environment. Periodically 5S scorecards should
be checked and 5S auditing should be carried out for long term benefits to the
organization.
Repair and maintenance of heavy
equipment activities are performed in less time and with a considerable
decrease in the cost, with an increase in available space dedicated to the equipment.
After that, it also decreases the preparation time, maintenance costs, the
anomalies identification time and the accident rate.
A clean workplace, well-organized
and with visual indications of risks, is a safe workplace. The boards and
labels installation allows workers to know at all times what the potential
risks are. First result is reducing maintenance activity until 95 minutes
faster than before. And give impact to the second result with increasing in the
degree of equipment availability 3.75% average and productivity 10.58 tons/hour
equals to 253.92 tons/day.
AL-AOMAR,
R. A. (2011) Applying 5S LEAN Technology: An infrastructure for continuous
process improvement. World Academy of
Science, Engineering and Technology, n. 59, p. 2014-2019.
ANON, (2007) 5S Management.
http://vdb.gib.govtr/edirnevdb/sunumlar/5S Sunum/5Sy. html.
BAMBER, C. J.; SHARP, J. M.;
HIDES, M. T. (2000) Developing management systems towards integrated
manufacturing: a case study perspective. Integr.
Manuf. Syst., v. 11, n. 7, p. 454–461.
BARLOW, R. E.; PROSCHAN, F.
(1975) Statistical Theory of Reliability
and Life Testing Probability Models, Holt, Rinehart and Winston, New York.
BECKER, J. E. (2001)
Implementing 5S to promote safety and housekeeping. Prof. Saf., v. 46, n. 8, p. 29–31.
BLANCHARD, B. S. (1998) Logistics Engineering and Management,
5th Edition, Prentice-Hall International, Upper Saddle River, NJ.
GAPP,
R.; FISHER, R.; KOBAYASHI, K. (2008) Implementing 5S within a Japanese context:
an integrated management system. Management
Decision, v. 46, n. 4, p. 565-579.
GOLLOP,
F. M. (1979) Accounting for intermediate input: The link between sectoral and
aggregate measures of productivity growth. The meaning and interpretation
of productivity, p. 318-33.
JIMÉNEZ,
M.; ROMERO, L.; DOMÍNGUEZ, M.; DEL MAR ESPINOSA, M. (2015) 5S methodology
implementation in the laboratories of an industrial engineering university
school. Safety science, n. 78, p. 163-172.
KARABULUT, A. (1999) Total
productive maintenance management. M.Sc. Thesis, Anadolu University, Institute of Social
Sciences, Eskisehir, Turkey.
KHEDKAR, S. B.; THAKRE, R. D.; MAHANTARE,
Y. V.; MR. GONDNE, R. (2012) Study of
Implementing 5S Techniques in Plastic Moulding, International Journal of Modern Engineering Research, v. 2, n. 5,
p. 3653-3656.
KOCAALAN, M. L. (1999) Improving
and increasing machine performance loy using total productive maintenance (TPM)
approach. M.Sc.
Thesis, Gazi University, Institute of Science and Technology, Ankara, Turkey.
KORKUT, D. S.; CAKICIER, N.;
ERDINLER. E. S.; ULAY, G.; DOGAN, A. M. (2009)
5S activities and its application at a sample company, African Journal of Biotechnology, v. 8,
n. 8, p. 1720-1728.
MORA, E. (2007) Essential in The Lean
Manufacturing Structure:
The “5S” Philosoph.
http://www.tpmonline.com/papakaizen.articls_on_lean_manufacturingstrategies/5s.htm.
PANCHAL, R. K. (2012) Improving
the organization through 5S methodology, Proceedings
of the National Conference on Trends and Advances in Mechanical Engineering,
YMCA University of Science & Technology, Faridabad, Haryana.
PATEL, V. C.; THAKKAR, H. (2014)
A Case Study: 5s Implementation in Ceramics Manufacturing Company. Bonfring International Journal of
Industrial Engineering and Management Science, v. 4, n. 3, p. 132.
PATRA, N. K.; TRIPATHY, J. K.;
CHOUDHARY, B. K. (2005) Implementing the office total productive maintenance
(“Office TPM”) program: a library case study. Library Review, v. 54, n. 7, p. 415-424.
SARICOBAN, E. (2006) The importance of 5S in total productive
maintenance activities and an application of 5S. Non-Thesis M.Sc. Project, Dokuz Eylül University, Institute of
Social Sciences, Izmir, Turkey.
SHEPPARD, S. D.; PELLEGRINO, J. W.;
OLDS, B. M. (2008) On becoming a 21st century engineer. J. Eng. Educ., v. 97, n. 3, p. 231–234.
SINGH, J.; RASTOGI, V.; SHARMA,
R. (2014) Implementation of 5S practices: A review. Uncertain Supply Chain Management, v. 2, n. 3, p. 155-162.
SINGH, R.; GOHIL, A. M.; SHAH,
D. B.; DESAI, S. (2013) Total productive maintenance (TPM) implementation in a
machine shop: A case study. Procedia
Engineering, n. 51, p. 592-599.
SOROOSHIAN, S.; SALIMI, M.;
BAVANI, S.; AMINATTAHERI, H. (2012) Case
report: experience of 5S implementation.
ZELINSKI, P. C. (2005). If 5S is
good, try 13S next. Mod. Mach. Shop,
v. 77, n. 9, p. 12.